Branch: refs/heads/2.3.0
Home:
https://github.com/Checkmk/checkmk
Commit: a389486c527a3225db59ba066824d052376c0290
https://github.com/Checkmk/checkmk/commit/a389486c527a3225db59ba066824d0523…
Author: Rebekka Seltmann <rebekka.seltmann(a)checkmk.com>
Date: 2024-05-13 (Mon, 13 May 2024)
Changed paths:
A .werks/16796.md
Log Message:
-----------
Licensing: Start trial period when switching to CCE or CME
When updating to an edition with mandatory licensing (CCE and CME), we want to give users
enough time to apply the license when updating.
A CME updated to 2.3 will now start in 30-day trial period instead of directly entering
the "free" license state if it otherwise would not be licensed.
However, in a distributed setup it is recommended to make use of the change in [werk
#16193](https://checkmk.com/werk/16193) to apply the license before the update.
CMK-17297
Change-Id: I2af1c4f635fcb8a331e08e9b6b2243d95c3d2762
To unsubscribe from these emails, change your notification settings at
https://github.com/Checkmk/checkmk/settings/notifications